Excavation Calculator

Bank volume is the in-place volume you dig. Loose volume is what you must haul away, and it is larger because soil expands. A 30 x 20 x 5 ft trench in general soil (30% swell) gives 3,000 cu ft bank and 3,900 cu ft loose.
Open the Excavation Calculator →

Formula

  1. Bank volume = Length x Width x Depth x quantity
  2. Loose volume = Bank volume x (1 + swell factor)
  3. Swell volume = Loose volume - Bank volume

Worked Example

InputValue
Trench30 x 20 x 5 ft
Bank volume3,000 cu ft
SoilGeneral, 30% swell
Loose volume3,900 cu ft
Extra to haul900 cu ft
Bank in metric84.95 cubic metres

Frequently Asked Questions

What is soil swell?

Soil expands when excavated because digging introduces voids. Sand swells about 15%, clay 25%, general soil 30% and blasted rock 50%.

What is the difference between bank and loose volume?

Bank volume is soil measured in place before digging. Loose volume is the same soil after excavation, and it determines truck loads.

How many cubic feet in a cubic metre?

One cubic metre equals 35.31 cubic feet.